Avalanche 2500 4WD V8-8.1L VIN G (2003)
14. Install the inlet hose to the water crossover.
15. Position the inlet hose clamp at the water crossover.
16. Install the drive belt tensioner.
17. Fill the cooling system.
14. Install the inlet hose to the water crossover.
15. Position the inlet hose clamp at the water crossover.
16. Install the drive belt tensioner.
17. Fill the cooling system.