chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Paint - Importance of Checking Clear Coat Thickness|Page 6590 > < Paint - Importance of Checking Clear Coat Thickness|Page 6588
Page 4
background image

^

Body side moldings if mechanically retained. If adhesive retained, mask molding.

NOTE:

Only items marked with an asterisk are "add" conditions to the Major Operation being performed. Removal time for the other Items listed is included
in the allowance.

LABOR OPERATION: A6110

TIME ALLOWANCE: See Chart That Follows (**)

NOTE:

The time allowances provided on the chart includes the hardware removal and installation (as indicated by the list guidelines), the masking and
unmasking of the vehicle, clearcoat removal (as indicated by the guidelines), the refinish (and colorcoat when required), mix time for primer/paint
and clearcoat, finesse/polish where required, washing and preparing the vehicle for delivery.

Technical Service Bulletin # 923310

Date: 911101

Paint - Acid Rain Damage to Base Coat/Clear Coat

Number:

92-33-10

Section:

10

Date:

NOV. 1991

Corporate Bulletin No.: 131060 

Paint - Importance of Checking Clear Coat Thickness|Page 6590 > < Paint - Importance of Checking Clear Coat Thickness|Page 6588