Blazer 2WD V6-4.3L VIN X (2004)
3. Install the purge solenoid mounting nuts.
Tighten
Tighten the nuts to 12 N.m (106 lb in).
4. Connect the purge solenoid electrical connector.
5. Connect the EVAP purge pipe.
3. Install the purge solenoid mounting nuts.
Tighten
Tighten the nuts to 12 N.m (106 lb in).
4. Connect the purge solenoid electrical connector.
5. Connect the EVAP purge pipe.