Blazer 4WD V6-4.3L VIN X (2005)
22. Install the PCV hose assembly to the intake manifold and the valve rocker arm cover.
23. Install the accelerator cable and cruise control cable bracket to the throttle body.
^
Tighten the accelerator cable and cruise control bracket nuts to 9 Nm (80 inch lbs.).
24. Install the accelerator cable bracket to the intake manifold and the throttle body.
^
Tighten the accelerator cable bracket studs and nuts to 12 Nm (106 inch lbs.).
25. Position the engine wiring harness.
26. Install the engine wiring harness clips in the brackets.
27. Connect the following electrical connectors:
^
The idle air control (IAC) motor (3)
^
The throttle position (TP) sensor (2)
^
The A/C compressor cutoff switch, if equipped (5)
^
The A/C clutch switch, if equipped (1)
^
The engine coolant temperature (ECT) sensor (4)