chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Idle Learn Procedure|Page 5680 > < Idle Learn Procedure|Page 5678
Page 2
background image

1. Install the PCM (4) to the PCM mounting bracket (7) ensuring that the mounting tabs (3) are engaged.
2. Secure the spring latch (2) to the PCM.

NOTE:  Refer to Fastener Notice in Service Precautions.

3. Connect the PCM connectors (6) to the PCM (4).

Tighten
Tighten the PCM connector end fasteners to 8 N.m (70 lb in).

4. Install the PCM cover (8) to the PCM mounting bracket (7), ensuring the mounting tabs on the PCM mounting bracket are engaged into the

mounting holes in the PCM cover.

5. If a new PCM is being installed, program the PCM.  See: Testing and Inspection/Programming and Relearning

Idle Learn Procedure|Page 5680 > < Idle Learn Procedure|Page 5678