chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Engine - Ticking Noise/Loss of Power|Page 3788 > < Engine - Ticking Noise/Loss of Power|Page 3786
Page 2
background image

5. Clean and inspect the valve rocker arms and pushrods. 

Installation Procedure

Important:  Be sure to keep parts in order. Parts must be put back from where they were removed.

1. Apply sealer GM P/N 12346004 or equivalent to the valve rocker arm stud-to-cylinder head threads.

Notice:  Refer to Fastener Notice in Service Precautions.

2. Install the pushrod guides and valve rocker arm studs.

^

Tighten the valve rocker arm studs to 50 Nm (37 ft. lbs.).

Important:  The exhaust valve pushrods (2) are longer than the intake valve pushrods (1).

3. Install the valve pushrods.

Engine - Ticking Noise/Loss of Power|Page 3788 > < Engine - Ticking Noise/Loss of Power|Page 3786