C 2500 Truck 2WD V8-6.6L DSL Turbo VIN 1 (2001)
3. Remove the water pump outlet pipe from the engine oil cooler assembly.
4. Remove and discard the O-ring seal.
5. Remove the gasket and clean the sealing surface.
Installation Procedure
1. Install a new O-ring seal on the water pump outlet pipe.
2. Lightly lubricate the O-ring seal with engine oil.
3. Install the water pump outlet pipe in the engine oil cooler assembly.
4. Install a new water pump outlet pipe to water pump gasket.
5. Install the water pump.
6. Install the left front fender wheelhouse inner panel (1).