chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Customer Interest: > < Power Steering Cooler Line - Leak
Page 2
background image

FIGURE 2 - "O" Ring Seal Installation

9.

Install new "O" ring seal, P/N 7829923, on fitting end of new pipe (see Figure 2).

10.

Place cooler pipe in position and thread pipe fitting into gear.  Do not tighten yet.

11.

Raise vehicle on hoist.

12.

Transfer the two (2) radiator support clips from old pipe. Install two (2) retaining screws and torque to 9 N-m (80 in.lbs.).

13.

Lower vehicle.

14.

Torque fitting at gear to 27 N-m (20 ft.lbs.).

15.

Transfer cooler pipe clip from the old pipe. Position clip on new pipe as shown in illustration and torque to 9 N-m (80 in.lbs.).

16.

Install return hose from P/S pump to cooler pipe with new clamp, P/N 2494772, and torque to 2.3 N-m (22 in.lbs.).

17.

Slide steering coupling shield back to original position.

18.

Reinstall air cleaner duct to radiator support.

19.

Reconnect negative battery cable.

20.

Refill P/S pump, bleed system, and check for leaks.

Labor Operation Number:

E8940

Labor Time

: .6 hours

Customer Interest: > < Power Steering Cooler Line - Leak