chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Powertrain Management > < Exhaust System - Paint Peeling from Painted Muffler
Page 2
background image

Labor

Material 

Operation

Labor Time

Allowance

A6150

0.6 hr - Single Exhaust

GC

Add

0.2 hr - Dual Exhaust

GC

Important

While the above procedure and materials are correct for vehicles from 1993 to 1998, the Labor Operation and Time Allowance only pertains to
vehicles in the Warranty period.

*

We believe this source and their equipment to be reliable. There may be additional manufacturers of such equipment. General Motors does not
endorse, indicate any preference for or assume any responsibility for the products or equipment from these firms or for any such items which may be
available from other sources.

Powertrain Management > < Exhaust System - Paint Peeling from Painted Muffler