Cavalier L4-2.2L VIN 4 (1998)
ASSEMBLY PROCEDURE
1. Lubricate rubber parts with clean brake fluid to ease assembly.
2. Install the lubricated secondary seal (10) onto the secondary piston (9).
3. Install the lubricated primary seal (8) onto the primary piston (11).
4. Install the spring retainer (7) onto the secondary piston (9).
5. Install the lubricated secondary piston spring (6) into the cylinder bore.
6. Install the lubricated secondary piston assembly (9) into the cylinder bore.
7. Install the lubricated primary piston (11) into the cylinder bore.
8. Install the piston retainer (12) while depressing the primary piston.
9. Install the proportioner valve assemblies (15-19). Refer to Proportioning Valve Replacement
10. Install the fluid level switch.
11. Install the master cylinder reservoir diaphragm (2) into the reservoir cover (1).
12. Install the master cylinder reservoir diaphragm and the reservoir cover into the master cylinder reservoir.
13. Install the master cylinder. Refer to Master Cylinder Overhaul.