Cavalier L4-2.2L VIN F (2004)
Intake Manifold And Components
6. Install the throttle body.
7. Connect the IAC electrical connector.
8. Connect the TPS electrical connector.
9. Connect the MAP sensor electrical connector.
10. Connect the EVAP hose.
11. Connect the PCV hose.
12. Connect the purge solenoid tube.
13. Connect the brake booster hose.
14. Install the oil level indicator tube bolt.
15. Connect the accelerator and the cruise control cables. Install the air inlet duct and resonator.