Cavalier/Z24 L4-138 2.3L DOHC VIN D MFI (1995)
3.
See the figure for approximate locations for the 10 mm (3/8 in.) drain holes in the foam. Hole location is critical.
4.
Install a drill stop placed approximately 32 mm (1-1/4 in.) from the end of a 3/8 drill bit.
5.
Install a drill bit in a 90° degree angle drill for better clearance and drill the holes on the marks, as shown in the figure.
6.
Vacuum up the foam and metal chips.
7.
After drilling the holes, it is important that the appropriate anti-corrosion primer be applied. Refer to GM Approved Refinish Materials Booklet
(GM4901M-D-99) for additional information.
8.
Repeat for the other side.
9.
Reinstall the seat belt retractors.
10.
Reinstall both quarter trim panels.
Warranty Information
For vehicles repaired under warranty, use:
Labor
Labor
Operation
Description
Time
C9047
Install Drain Path
1.0 hr