chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Battery Negative Cable Disconnect/Connect Procedure|Page 9766 > < Battery Negative Cable Disconnect/Connect Procedure|Page 9764
Page 6
background image

5. If equipped with RPO LSJ perform the following, position the negative battery cable ground terminal (5) to the engine block.
6. Position the engine harness ground (4) on top of the ground terminal.
7. Install the stud (2).

^

Tighten the stud to 25 Nm (18 ft. lbs.).

8. Install the engine harness grounds (2) onto the stud.
9. Install the engine harness ground nut (1).

^

Tighten the nut to 17 Nm (13 ft. lbs.).

10. If equipped with RPOs L61/LE5 with M86 perform the following, position the negative battery cable ground terminal (4) to the engine block.
11. Install the stud (2).

^

Tighten the stud to 25 Nm (18 ft. lbs.).

12. Install the engine harness ground terminal (3) to the stud (2).
13. Install the engine harness ground nut (1).

^

Tighten the nut to 17 Nm (13 ft. lbs.).

Battery Negative Cable Disconnect/Connect Procedure|Page 9766 > < Battery Negative Cable Disconnect/Connect Procedure|Page 9764