chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

A/T - 4T45-E Mid-Year Production Changes|Page 8776 > < A/T - 4T45-E Mid-Year Production Changes|Page 8774
Page 2
background image

3. Inspect the TFP switch assembly (13) in order to verify the condition and correct location of the seven pressure switch O-rings.
4. If necessary replace the pressure switch O-rings.

5. Install the TFP switch assembly (13) onto the control valve body assembly.

6. Install the eighteen control valve body assembly bolts.

A/T - 4T45-E Mid-Year Production Changes|Page 8776 > < A/T - 4T45-E Mid-Year Production Changes|Page 8774