Colorado 4WD L5-3.5L VIN 6 (2005)
44. Twist together the 2 connector wire leads from the low circuits from both stages of the I/P module to one set of deployment wires. Refer to SIR
Connector End Views in order to determine the correct circuits.
45. Inspect that the 3-wire connection is secure.
46. Bend flat the twisted connection.
47. Secure and insulate the 3-wire connection to the deployment harness using electrical tape.
48. Connect the deployment harness to the I/P module in-line connector.
49. Route the deployment harness out of the passenger side of the vehicle.