Colorado 4WD L5-3.7L (2007)
1. Position the catalytic converter heat shield to the floor panel studs.
Notice: Refer to Fastener Notice.
2. Install the 5 nuts securing the heat shield to the floor panel.
Tighten the heat shield nuts to 9 N.m (80 lb in).
3. Lower the vehicle.