chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Lamps and Indicators - Engine > < Engine - Intake Manifold Inspection/Replacement|Page 1593
Page 2
background image

21. Bypass hose at fill neck and head
22. Heater inlet pipe at manifold
23. Intake manifold bolts
24. Intake manifold
25. Loosen rocker arms
26. Remove push rods

CLEAN

^

Gasket material

^

Loose RTV from front and rear ridges of cylinder block

^

Sealing surfaces with degreaser

INSTALL OR CONNECT

1. Place a 5.0 mm diameter (3/16") bead of GM 1052917. RTV sealer or equivalent on each ridge
2. Intake gasket
3. Push rods and tighten rocker arm nuts to 24 Nm (18 ft. lbs.)
4. Intake manifold on engine tighten to 33 Nm (24 ft. lbs.)
5. Manifold bolts and nut
6. Heater inlet pipe
7. Coolant sensor
8. Wires at coolant sensor and oil sending unit
9. Radiator hose at the thermostat outlet

10. Fill cooling system
11. Rocker arm cover as previously outlined
12. Breather tube
13. Fuel rail
14. Wires at the injectors
15. Idle air vacuum hose at the throttle body
16. Generator bracket
17. Generator
18. P/S pump
19. Serpentine belt
20. Fuel inlet and return pipes at the fuel rail
21. Plenum
22. EGR valve
23. Throttle body at the plenum
24. Accelerator and T.V. cable bracket at the plenum
25. Connect battery
26. Let engine run until radiator upper hose become hot (thermostat open)

INSPECT

^  Coolant level
^  For fluid leaks

Lamps and Indicators - Engine > < Engine - Intake Manifold Inspection/Replacement|Page 1593