chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Electronic/Dual Zone Climate Controls|Page 3082 > < Electronic/Dual Zone Climate Controls|Page 3080
Page 5
background image

9. Install new cavity (1), whistle (2), and permagum (3) seals on the heater core coven

10. Install the heater core cover.

-

Tighten the heater core cover screws to 1.6 Nm (14 lb. in).

11. Install the heater/evaporator module into the vehicle. Refer to Heater/Evaporator Module Assembly

12. Connect the negative battery cable.

CAUTION: Refer to Battery Disconnect Caution.

13. Fill the cooling system.

14. Evacuate and recharge the A/C system. Refer to Evacuation and A/C Charging Using ACR4.

Electronic/Dual Zone Climate Controls|Page 3082 > < Electronic/Dual Zone Climate Controls|Page 3080