Corvette V8-6.0L VIN U (2005)
1. Disconnect the engine purge pipe (1) from the chassis purge pipe (2).
2. Cap the engine purge pipe in order to prevent possible contamination.
3. Disconnect the chassis fuel and evaporative emission (EVAP) pipe retainer (1) from the upper front of dash mounting stud (3).
4. Raise the vehicle. Refer to Vehicle Lifting.
5. Remove the exhaust intermediate pipe.
6. Remove the driveline tunnel closeout panel.
7. Remove the EVAP canister vent valve (2) from the bracket (1).