chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Deployment Procedures|Page 9526 > < Deployment Procedures|Page 9524
Page 11
background image

28. Twist together two connector wire leads (the high circuits from side air bag and pretensioner ) to one sets of deployment wires. Refer to SIR

Connector End Views in order to determine the correct circuits.

29. Inspect that the 3 wire connection is secure.

30. Bend flat the twisted connection.

31. Secure and insulate the 3 wire connection to deployment harness using electrical tape.

32. Twist together two connector wire leads (the low circuits from side air bag and pretensioner ) to one sets of deployment wires. Refer to SIR

Connector End Views in order to determine the correct circuits.

33. Inspect that the 3 wire connection is secure.

34. Bend flat the twisted connection.

Deployment Procedures|Page 9526 > < Deployment Procedures|Page 9524