chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Charging System > < Battery Positive Cable Replacement|Page 7186
Page 2
background image

1. Install and route the fuse block cable through the front of dash.
2. Install the battery positive fuse block cable to the stud.

NOTE:  Refer to Fastener Notice in Service Precautions.

3. Install the I/P wiring harness junction block nut.

Tighten the I/P wiring harness junction block nut to 10 N.m (89 lb in).

4. Reposition the junction block nut boot.
5. Snap the junction block to the bracket.

6. Ensure the latches on the kick-up panel are open.
7. Insert the kick-up panel lower tabs into the slots in the bracket.
8. Close the panel and push the latches into the holes.

9. Install the battery positive fuse block cable to the stud.

10. Install the positive battery cable lead to the stud.
11. Install the positive battery cable nut (1).

Tighten the positive battery cable nut to 10 N.m (89 lb in).

12. Close the stud cover on the fuse/relay center cover.
13. Install the battery tray.

Charging System > < Battery Positive Cable Replacement|Page 7186