chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Grounding Point > < Instrument Panel Electrical Center or Junction Block Replacement|Page 8743
Page 2
background image

3. Install the underhood junction block connector bolts.

Tighten the underhood junction block connector bolts to 7 N.m (62 lb in).

4. Turn the electrical center right side up.
5. Connect the electrical cable retainers at the rear of the junction block.

6. Install the junction block cover.
7. Install the positive battery cable lead to the junction block stud. Install the positive battery cable lead nut.

Tighten the positive battery cable lead nut to 10 N.m (89 lb in).

8. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection (6.0L)  (See: Battery/Battery Cable/Service

and Repair)Battery Negative Cable Disconnection and Connection (7.0L)  (See: Battery/Battery Cable/Service and Repair) .

Grounding Point > < Instrument Panel Electrical Center or Junction Block Replacement|Page 8743