Corvette V8-6.2L SC (2009)
8. Connect the right front brake pipe fitting (1) and tighten to 18 Nm (13 lb ft).
9. Connect the left front brake pipe fitting (2) and tighten to 18 Nm (13 lb ft).
10. Connect the left rear brake pipe fitting (1) and tighten to 18 Nm (13 lb ft).
11. Connect the right rear brake pipe fitting (2) and tighten to 18 Nm (13 lb ft).
12. Connect the EBCM electrical connector.
13. Install the air cleaner assembly. Refer to Air Cleaner Assembly Replacement (6.2L) (See: Engine, Cooling and Exhaust/Engine/Tune-up and
Engine Performance Checks/Air Cleaner Housing/Service and Repair)Air Cleaner Assembly Replacement (7.0L) (See: Engine, Cooling and
Exhaust/Engine/Tune-up and Engine Performance Checks/Air Cleaner Housing/Service and Repair)Air Cleaner Assembly Replacement (LS9) (
See: Engine, Cooling and Exhaust/Engine/Tune-up and Engine Performance Checks/Air Cleaner Housing/Service and Repair).
14. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection (LS7 or LS9) (See: Starting and
Charging/Battery/Battery Cable/Service and Repair)Battery Negative Cable Disconnection and Connection (LS3) (See: Starting and
Charging/Battery/Battery Cable/Service and Repair).
15. If installing a new EBCM, program the EBCM. Refer to Service Programming System (SPS) (See: Testing and Inspection/Programming and
Relearning).
16. Perform the Antilock Brake System Automated Bleed Procedure (See: Brake Bleeding/Service and Repair).