chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Heater Inlet Pipe Replacement|Page 3684 > < Heater Inlet Pipe Replacement|Page 3682
Page 12
background image

3. Release and slide the thermal bypass pipe hose clamps (2) away from the hose connections.
4. Remove thermal bypass hose (1).

Installation Procedure

1. Apply engine coolant to the bypass hose in order to ease installation.

2. Install the thermal bypass pipe hose (1).
3. Position the thermal bypass pipe hose clamps (2) over the hose end connections.
4. Fill the cooling system. Refer to Cooling System Draining and Filling (LNJ Static Fill)  (See: Service and Repair)Cooling System Draining and

Filling (LNJ GE 47716 Fill)  (See: Service and Repair)Cooling System Draining and Filling (LY7 Static Fill)  (See: Service and Repair)Cooling
System Draining and Filling (LY7 GE 47716 Fill)  (See: Service and Repair) .

5. Install the fuel injector sight shield. Refer to Fuel Injector Sight Shield Replacement  (See: Powertrain Management/Fuel Delivery and Air

Induction/Fuel Injector/Service and Repair/Removal and Replacement/Fuel Injector Sight Shield Replacement) .

Thermal Bypass Pipe Replacement

Thermal Bypass Pipe Replacement

Tools Required

J 21882 Oil Suction Pipe Installer

Removal Procedure

1. Drain the engine coolant. Refer to Cooling System Draining and Filling (LNJ Static Fill)  (See: Service and Repair)Cooling System Draining and

Filling (LNJ GE 47716 Fill)  (See: Service and Repair)Cooling System Draining and Filling (LY7 Static Fill)  (See: Service and Repair)Cooling
System Draining and Filling (LY7 GE 47716 Fill)  (See: Service and Repair) .

Heater Inlet Pipe Replacement|Page 3684 > < Heater Inlet Pipe Replacement|Page 3682