Equinox AWD V6-3.4L (2008)
3. Install the negative battery cable (3) lead to the stud.
4. Install the engine wiring harness ground lead (1) to the stud.
Notice: Refer to Fastener Notice.
5. Install the negative battery cable ground terminal nut (2) to the transaxle stud.
Tighten the nut to 45 N.m (33 lb ft).
6. Install the negative battery cable ground terminal to the wheelhouse stud.
7. Install the negative battery cable ground terminal nut to the wheelhouse stud.
Tighten the nut to 12 N.m (106 lb in).