Express 1/2 Ton Van V6-4.3L VIN W (1999)
12. Remove the accumulator (2) and O-ring seal (3).
INSTALLATION PROCEDURE
1. Lubricate all seals and metal friction points with power steering fluid.
2. Install the accumulator (2) and O-ring seal (3).
3. Place the J 26889 over the end of the accumulator.
4. Install the nut on the stud.
5. Depress the accumulator with a C-clamp.