Express 1/2 Ton Van V6-4.3L VIN W (1999)
6. Install the bolt holding the bracket for the starter wiring harness and the transmission cooler pipes.
^
Tighten the bracket bolt to 12 Nm (106 inch lbs.).
7. Install the CKP sensor wiring harness in the retainer.
8. Install the oil filter adapter.
9. Install the oil filter and the oil pan drain plug.
10. Lower the vehicle.
11. Fill the crankcase with engine oil.
12. Connect the battery negative cable.