Express 1/2 Ton Van V6-4.3L VIN W (1999)
5. Pull the control head out of the instrument panel far enough to reach the vacuum and the electrical connectors.
6. Remove the electrical connectors.
7. Remove the vacuum connectors.
INSTALLATION PROCEDURE
1. Install the vacuum connectors.
2. Install the electrical connectors.
3. Install the control head to the instrument panel by the following procedures:
4. Align the tab on the right side of the control head with the slot in the instrument panel.
5. Pivot the control head into the instrument panel.