Express 1/2 Ton Van V6-4.3L VIN W (1999)
5. Install the connectors to the VCM.
6. Install the VCM in the engine compartment.
7. Install the retaining springs over the edges of the VCM.
8. Connect the negative battery cable.
9. Program the VCM. See: Testing and Inspection