Express 1/2 Ton Van V6-4.3L VIN W (1999)
5. Install the new prevailing torque nut (3) to the ball stud.
-
Tighten the nut to 47 Nm (35 ft. lbs.).
6. Install the grease fitting, if equipped. Grease the steering linkage.
7. Remove the safety stands.
Lower the vehicle.
8. Check the wheel alignment. Refer to Alignment.