chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Ball Check Valve|Page 6279 > < Ball Check Valve|Page 6277
Page 10
background image

9.2.

The 1-2 shift valve (2)

9.3.

The 1-2 shift solenoid valve (1)

9.4.

The solenoid valve retainer (4)

10. Install the following items:

10.1.

The forward abuse valve (5)

10.2.

The forward abuse valve spring (6)

10.3.

The bore plug (8)

10.4.

The coiled spring pin (7)

10.5.

The low overrun valve (9)

10.6.

The low overrun valve spring (10)

11. Install the following items:

11.1.

The forward accumulator oil seal (4) on the forward accumulator piston (3)

11.2.

The forward accumulator pin (2)

11.3.

The forward accumulator piston (3)

11.4.

The forward accumulator spring (1)

11.5.

The forward accumulator cover (12)

11.6.

The forward accumulator cover bolts (11)

12. Install the manual valve (1).

Installation Procedure 

Ball Check Valve|Page 6279 > < Ball Check Valve|Page 6277