Express 1/2 Ton Van V8-305 5.0L VIN M SFI (1998)
1. The cooler to the vehicle.
2. The bolts.
Tighten
^
The bolts to 5 Nm (44 inch lbs.).
3. The power steering cooler hose and pipe connections.
^
Fill and bleed the system.
1. The cooler to the vehicle.
2. The bolts.
Tighten
^
The bolts to 5 Nm (44 inch lbs.).
3. The power steering cooler hose and pipe connections.
^
Fill and bleed the system.