chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Starter Relay > < Starter Motor|Locations|Page 11529
Page 3
background image

3. Install the positive cable to the starter stud.

Notice:  Refer to Fastener Notice.

4. Install the starter lead nut.

Tighten the starter lead nut to 10 N.m (89 lb in).

5. Install the starter solenoid lead to the solenoid stud.
6. Install the starter solenoid nut.

Tighten the starter solenoid nut to 3.4 N.m (30 lb in).

7. Slide the starter rearward.
8. Install the starter bolts.

Tighten the starter bolts to 50 N.m (37 lb ft).

9. Connect the oil level sensor electrical connector.

10. Install the right transmission cover bolt.

Tighten the transmission cover bolt to 9 N.m (80 lb in).

11. Lower the vehicle.
12. Connect the negative battery cable.

Starter Relay > < Starter Motor|Locations|Page 11529