Express 1500 RWD V8-5.3L (2008)
Tighten the nut to 250 N.m (184 lb ft).
4. Remove the power steering gear from the vise.
5. Install the power steering gear. Refer to Steering Gear Replacement (Non-Rack and Pinion) (See: Steering Gear/Service and Repair)Steering Gear
Replacement (Rack and Pinion) (See: Steering Gear/Service and Repair) .
6. Lower the vehicle.
7. Check the wheel alignment. Refer to Wheel Alignment Measurement (See: Alignment/Service and Repair/Wheel Alignment Measurement) .