Express 2500 V8-4.8L (2007)
13. Connect the low pressure sensor electrical connector (2).
14. Install the coolant recovery reservoir.
15. Evacuate and recharge the A/C system. Refer to Refrigerant Recovery and Recharging.
16. Leak test the fittings of the components using the J 39400-A.