Express 2500 V8-4.8L (2007)
8. Remove the 3-2 control solenoid retainer.
9. Remove the 3-2 control solenoid.
Installation Procedure
1. Install the 3-2 control solenoid.
2. Install the 3-2 control solenoid retainer.
3. Install the 1-2 and 2-3 shift solenoids.
4. Install the 1-2 and 2-3 shift solenoid retainers.
5. Install the pressure control solenoid.