Express 2500 V8-5.3L VIN T (2005)
1. Install the coolant air bleed hose (1) to the pipe (2).
2. Position the coolant air bleed hose clamp at the pipe.
3. Install the coolant air bleed hose to the throttle body.
4. Position the coolant air bleed hose clamp at the throttle body.
5. Install the generator.
6. Install the air cleaner assembly.
7. Fill the cooling system.