chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Power and Ground Distribution > < Diagram Information and Instructions|Page 9605
Page 3
background image

3. Install the positive cable to the starter stud.

NOTE:  Refer to Fastener Notice in Service Precautions.

4. Install the starter lead nut.

Tighten the starter lead nut to 10 N.m (89 lb in).

5. Install the starter solenoid lead to the solenoid stud.
6. Install the starter solenoid nut.

Tighten the starter solenoid nut to 3.4 N.m (30 lb in).

7. Slide the starter rearward.
8. Install the starter bolts.

Tighten the starter bolts to 50 N.m (37 lb  ft).

9. Connect the oil level sensor electrical connector.

10. Install the right transmission cover bolt.

Tighten the transmission cover bolt to 9 N.m (80 lb in).

11. Lower the vehicle.
12. Connect the negative battery cable.

Power and Ground Distribution > < Diagram Information and Instructions|Page 9605