Express 2500 V8-6.6L DSL Turbo (2010)
5. Install the rear EGR cooler tube bracket and bolts and tighten to 25 Nm (18 lb ft).
6. Install the EGR cooler tube bracket bolt and nut and tighten to 20 Nm (15 lb ft).
7. Install the generator. Refer to Generator Bracket Replacement (V8) (See: Starting and Charging/Charging System/Alternator/Service and
Repair/Generator Bracket Replacement)Generator Bracket Replacement (V6) (See: Starting and Charging/Charging System/Alternator/Service
and Repair/Generator Bracket Replacement)Generator Bracket Replacement (LMM) (See: Starting and Charging/Charging
System/Alternator/Service and Repair/Generator Bracket Replacement)Generator Bracket Replacement (LGH) (See: Starting and
Charging/Charging System/Alternator/Service and Repair/Generator Bracket Replacement).
8. Install the right side fuel rail. Refer to Fuel Injection Fuel Feed Front Pipe Replacement - Right Side (See: Powertrain Management/Fuel Delivery
and Air Induction/Fuel Supply Line/Service and Repair/Fuel Injection Fuel Feed Front Pipe Replacement - Right Side).
9. Install the fuel injector return pipe clamp and reposition on the stud.
10. Install the fuel injectors. Refer to Fuel Injector Replacement (Left) (See: Powertrain Management/Fuel Delivery and Air Induction/Fuel
Injector/Service and Repair/Removal and Replacement/Fuel Injector Replacement (Left Side)) Fuel Injector Replacement (Right) (See:
Powertrain Management/Fuel Delivery and Air Induction/Fuel Injector/Service and Repair/Removal and Replacement/Fuel Injector Replacement
(Right Side)).
11. Install the right upper valve rocker arm cover. Refer to Valve Rocker Arm Upper Cover Replacement - Right Side (LMM) (See: Valve Rocker
Arm Upper Cover Replacement - Right Side).