Express 2500 V8-6.6L DSL Turbo VIN 2 (2007)
1. Apply a 2-3 mm (1/8 in) wide, by 0.5-1.5 mm (1/16 in) high bead of sealant to the intake manifold. Refer to Sealers, Adhesives, and Lubricants.
2. Install the intake manifold.
3. Install the intake manifold bolts/nuts.
Right Side
Notice: Refer to Fastener Notice.
4. Tighten the intake manifold bolts/nuts.
Tighten the bolts/nuts in the sequence shown to 25 N.m (18 lb ft).
5. Install the right fuel rail. Refer to Fuel Injection Fuel Rail Assembly Replacement - Bank 2.
6. Install the center intake manifold.
Intake Manifold Tube Replacement (LLY, LBZ)
Intake Manifold Tube Replacement (LLY, LBZ)
Removal Procedure