chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Turbocharger Exhaust Pipe Replacement (6.6L (LBZ/LLY))|Page 5617 > < Turbocharger Exhaust Pipe Replacement (6.6L (LBZ/LLY))|Page 5615
Page 7
background image

10. Install the EGR cooler pipe hose to the EGR cooler tube and Reposition the EGR cooler pipe clamp (1).

11. Position the transmission fill tube.
12. Install the transmission fluid fill tube to bell housing nut.

Tighten the nut to 18 N.m (13 lb ft).

13. Install the EGR cooler pipe bolt.

Tighten the bolt to 9 N.m (80 lb in).

14. Fill the cooling system. 
15. Install the engine cover. 

Turbocharger Exhaust Pipe Replacement (6.6L (LBZ/LLY))|Page 5617 > < Turbocharger Exhaust Pipe Replacement (6.6L (LBZ/LLY))|Page 5615