chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Turbocharger Vane Position Sensor > < Turbocharger Vane Actuator|Diagrams|Page 11293
Page 4
background image

4.  Position the oil feed pipe to the turbocharger.
5.  Install a NEW turbocharger oil feed pipe washer and the banjo bolt.

Tighten the bolt to 34 N.m (25 lb ft).

6.  Install the EGR cooler pipe.

7.  Position the turbocharger heat shield and install the 3 bolts.

Tighten the 3 bolts to 9 N.m (80 lb in).

8.  Install the engine cover.
9.  Perform the turbocharger learn procedure. Refer to Turbocharger Learn.

Turbocharger Vane Position Sensor > < Turbocharger Vane Actuator|Diagrams|Page 11293