Express 3/4 Ton Van V6-4.3L VIN W (1998)
6. Remove the spring, piston, ring, and pin.
7. Inspect the accumulators.
INSTALLATION PROCEDURE
1. Install the spring, piston, ring, and pin.
2. Install the control valve, if removed.
3. Install the springs, ring, and piston.
4. Install the cover and pin.
5. Install the bolts attaching the cover and pin to the transmission case.
^
Tighten the bolts to 11 Nm (97 inch lbs.)