Express 3/4 Ton Van V8-305 5.0L VIN M SFI (1999)
3. Install the following components to the instrument panel extension:
-
The headlamp leveling actuator switch (2)
-
The bezel
4. Install the electrical connector to the headlamp leveling actuator switch.
5. Install the bezel (1) to the instrument panel extension.