Express 3/4 Ton Van V8-4.8L VIN V (2003)
INSTALLATION PROCEDURE
1. If necessary, install the starter shield.
2. Snap the transmission cover to the starter.
3. Install the positive cable to the starter stud.
NOTE: Refer to Fastener Notice in Service Precautions.