chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

4L60-E/4L65-E|Page 4335 > < 4L60-E/4L65-E|Page 4333
Page 4
background image

5. Ensure that the three retaining ring ears are seen from inside the fitting and that the retaining ring moves freely in the fitting slots.
6. Install the new retaining ring (E-clip) into the remaining quick connect fittings.

Notice:  Ensure that the cooler line being installed has a plastic cap on each end that connects to a quick connect fitting. If no plastic cap exists, or
the plastic cap is damaged, obtain a new plastic cap and position on to the cooler line prior to the cooler line installation.

7. Install the cooler lines to the vehicle.

8. Install the cooler lines into the quick connect fittings.
9. Insert the cooler line end into the quick connect fitting until a click is either heard or felt.

4L60-E/4L65-E|Page 4335 > < 4L60-E/4L65-E|Page 4333