Express 3/4 Ton Van V8-6.5L DSL Turbo VIN F (1999)
14.5. Continue to fill the surge tank to the proper level.
14.6. Install the cap on the surge tank.
15. Install the air intake duct to the turbocharger.
16. Install the air cleaner assembly in the vehicle.
17. Inspect the system for coolant leaks.