Express 3/4 Ton Van V8-6.5L DSL Turbo VIN F (1999)
3. Install the valve rocker arm cover bolts.
^
Tighten the bolts to 22 Nm (16 ft. lbs.).
4. Install the fuel injection lines and clips.
5. Install the wiring harness and all the electrical connectors at the valve rocker arm cover from the clips and move aside (left side).
6. Install the engine oil level indicator and tube.
7. Install the transmission oil level indicator tube and bracket.
8. Install the lower intake manifold to the cylinder head.
9. Install the CDR valve and hose.
10. Install the rear generator support bracket.
11. Install the upper intake manifold to the lower intake manifold.
12. Connect the battery negative cables from the batteries.