chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Positive Crankcase Ventilation > < Exhaust Gas Recirculation Coolant Hoses/Pipes Replacement (LLY, LBZ)|Page 7515
Page 5
background image

6. Install the EGR cooler pipe hose to the EGR cooler tube and reposition the EGR cooler pipe clamp (1).
7. Fill the cooling system. 
8. Install the engine cover. 

Positive Crankcase Ventilation > < Exhaust Gas Recirculation Coolant Hoses/Pipes Replacement (LLY, LBZ)|Page 7515