Express 3500 V8-4.8L VIN V (2005)
9. Install the spark plug wires to the ignition coils.
10. Position the engine harness, if necessary.
11. Install the harness clips (2).
12. Connect the main electrical connector (1) feeding the ignition coils.
13. Install the CPA lock.
14. Install the oil fill tube.
15. Install the upper transmission fill tube.
16. Install the engine cover.